Illustrative Engineering Study — Not a Completed Project ReferenceWastewater / ETP

Industrial Effluent Treatment — Selecting a Treatment Train

Project Challenge

An industrial facility generating mixed chemical effluent required a treatment system capable of meeting discharge standards while accommodating variable influent characteristics.

Design Considerations

  • Influent characterisation and variability analysis
  • Biological vs. physico-chemical treatment assessment
  • Sludge generation and handling requirements
  • Discharge standard compliance pathway

Selected Treatment Approach

A multi-stage treatment train was evaluated comprising equalisation, pH adjustment, coagulation-flocculation, MBBR-based biological treatment, secondary clarification and tertiary filtration.

Verification Status

Conceptual design stage — pending detailed engineering and site-specific validation.

Illustrative Engineering Study — Not a Completed Project ReferencePackaged Plants

Containerised Sewage Treatment — Modular STP Concept

Project Challenge

A facility with limited available space and accelerated timelines required a sewage treatment solution that could be deployed without extensive civil construction.

Design Considerations

  • Available footprint and access constraints
  • Design flow and peak-flow conditions
  • Treated water reuse feasibility
  • Transport and crane access requirements

Selected Treatment Approach

A containerised SBR-based STP configuration was assessed, incorporating pre-assembled biological treatment, clarification and disinfection within standard ISO containers.

Verification Status

Feasibility assessment complete — detailed design subject to site survey and geotechnical data.

Illustrative Engineering Study — Not a Completed Project ReferenceWater Treatment

Industrial Water Recycling — Reducing Freshwater Demand

Project Challenge

An industrial operation sought to reduce its freshwater consumption by evaluating opportunities to treat and reuse process wastewater and cooling-tower blowdown.

Design Considerations

  • Wastewater quality and reuse-quality requirements
  • Membrane fouling and pre-treatment needs
  • Concentrate management options
  • Economic viability and payback assessment

Selected Treatment Approach

A tertiary treatment and UF/RO configuration was evaluated, with reject management through concentrate reduction and controlled discharge.

Verification Status

Assessment in progress — water balance and treatment trial data being compiled.

Illustrative Engineering Study — Not a Completed Project ReferenceAir Pollution Control

Multi-Stage Chemical Fume Scrubbing

Project Challenge

A chemical manufacturing process generating a complex gas stream containing both acidic (HCl, SO₂) and alkaline (NH₃) components required a treatment system to meet stack emission limits.

Design Considerations

  • Gas composition and concentration ranges
  • Temperature and moisture conditions
  • Chemical compatibility of scrubbing media
  • Pressure-drop constraints and fan selection

Selected Treatment Approach

A two-stage packed-bed scrubber system was conceptualised: an acidic first stage (caustic scrubbing) followed by an acid-wash second stage for ammonia removal, with mist elimination.

Verification Status

Conceptual treatment train defined — detailed gas analysis and pilot testing recommended.

Illustrative Engineering Study — Not a Completed Project ReferenceAir Pollution Control

Dust Collection — Particulate Capture Assessment

Project Challenge

A mineral processing operation required an assessment of its particulate emissions and capture requirements to meet regulatory and occupational health standards.

Design Considerations

  • Particle size distribution and loading
  • Temperature and moisture in the gas stream
  • Collection efficiency requirements
  • Maintenance access and filter media selection

Selected Treatment Approach

A pulse-jet bag filter system was evaluated with cyclone pre-separation for coarse particulate, appropriately sized ductwork and an induced-draft fan arrangement.

Verification Status

Preliminary design complete — filter media selection pending confirmation of operating temperatures.

Illustrative Engineering Study — Not a Completed Project ReferenceAll

Integrated Environmental Systems — Water & APC in One Facility

Project Challenge

An integrated industrial facility required both water/wastewater treatment and air pollution control systems, with the opportunity to coordinate design, instrumentation and utilities.

Design Considerations

  • Shared utility and infrastructure requirements
  • Common instrumentation and control philosophy
  • Coordinated installation and commissioning
  • Integrated monitoring approach

Selected Treatment Approach

A combined scope was evaluated including ETP, process water treatment, chemical fume scrubbing and dust collection, with a unified control panel and optional monitoring integration.

Verification Status

Scope definition stage — individual system designs to follow detailed process review.